Turbo Installation Instruction
Pre-Installation
- Service air cleaners and eliminate all restrictions and leaks.
- Inspect and remove all foreign material from air inlet and exhaust manifold before installing.
- Replace all oil pressure and drain lines which could be kinked, broken or internally damaged.
- Change engine oil and oil filters.
- Replace all contaminated crankcase and compressor filters.
Pre-Lubrication
- Do not start engine before attaching new oil drain line to turbocharger, crank engine until oil flows from oil drain hole in bearing housing.
- Attach new oil drain line to turbocharger.
Installation
- Mount turbocharger and exhaust manifold using new gasket and avoid usingsealing material.
- Inspect exhaust system; remove any restrictions which might cause excessive back pressure before connecting to turbocharger.
- Attach new oil inlet line to turbocharger.
- Align bearing housing drain hole to not more than 30 deg. From verticalcenter position.
- Tighten clamps, cap screws or nuts to recommended specifications.
- Connect air pipage system to turbocharger.
Operation
- Idle engine for 5 minute.
- Check all systems for oil, air or exhaust leaks.
- Always have operated idle engine for 1 minute prior to shutdown for longer turbocharger life.



